Gas Turbine Power Plants: Comprehensive Professional Program

SGT-PW10910 daysProfessional programPower Generation & Utilities

Overview

Gas Turbine Power Plants: Comprehensive Professional Program prepares utility and power plant staff to run assets safely, reliably and efficiently while meeting regulatory and customer expectations. Over ten days it covers the full scope of the subject, from fundamentals to advanced practice, and ends with a workplace-based capstone project.

What you will be able to do

  • Master Gas Turbine Power Plants from fundamentals to advanced practice.
  • Apply start-up, shutdown and dispatch, protection, control and SCADA and maintenance and outage planning in integrated case studies.
  • Design an improvement program covering environmental and regulatory compliance and asset performance and KPIs.
  • Assess risk, cost and performance with recognised indicators.
  • Complete a capstone project based on your own workplace.
  • Present recommendations to management with confidence.

Who should attend

  • Specialists and supervisors preparing to lead the function
  • Power plant engineers and operators
  • Utility network engineers
  • Water and desalination plant staff
  • Utility managers and planners

Daily outline

  1. Day 1Introduction to Gas Turbine Power Plants: concepts, terminology and standards
  2. Day 2Start-up, shutdown and dispatch
  3. Day 3Protection, control and SCADA
  4. Day 4Maintenance and outage planning
  5. Day 5Efficiency, losses and heat rate
  6. Day 6Environmental and regulatory compliance
  7. Day 7Asset performance and KPIs
  8. Day 8Plant and network configuration
  9. Day 9Operating principles and performance
  10. Day 10Capstone project presentations and final assessment

Sessions 2027–⁠2030

DatesCityFeeRegister
10–⁠21 January 2027RUHRiyadh$8,500Register
11–⁠22 July 2027MCTMuscat$8,500Register
4–⁠8 October 2027WEB Online$4,500Register
26 March – 6 April 2028MCTMuscat$8,500Register
26–⁠30 June 2028WEB Online$4,500Register
18–⁠29 September 2028MADMadrid$8,500Register
25 February – 8 March 2029RUHRiyadh$8,500Register
26 August – 6 September 2029MCTMuscat$8,500Register
26–⁠30 November 2029WEB Online$4,500Register
25 February – 1 March 2030WEB Online$4,500Register
20–⁠31 May 2030MADMadrid$8,500Register
17–⁠28 November 2030JEDJeddah$8,500Register

The Gas Turbine Power Plants series

Frequently asked questions

How much does Gas Turbine Power Plants: Comprehensive Professional Program cost?

For the 10-day program the fee is US$4,500 per participant online or US$8,500 in the classroom.

Where and when is the course held?

Sessions run from 2027 to 2030 in Riyadh, Muscat, Madrid and Jeddah, and live online. See the session table above for exact dates.

What certificate will I receive?

Participants who complete the course receive an SGT certificate of completion showing the training hours.

In which language is the course delivered?

Sessions are delivered in English or Arabic. Tell us your preferred language when you register.

Can SGT deliver this course in-house?

Yes. For groups we deliver the course at your premises in any city, with content adapted to your equipment and procedures.

How do I register?

Send the course name, city and dates on WhatsApp to +20 106 597 6553. We reply with booking confirmation and registration steps.

Related courses

All Power Generation & Utilities courses

from$4,500
DatesRegister

Ready to book a seat or plan in-house training?

Send us the course name and preferred city on WhatsApp. We reply with dates, a quotation and registration steps.

Register on WhatsApp ⁦+20 106 597 6553⁩